top of page
Connect according to the diagram below
Schermafbeelding 2024-03-18 om 12.07.12.png

Pump (N2 L2)

Heatpump (N3 L3)

Water treatment (N4 L4)

Cover (N5 L5)

Lights (N6 L6)

Pump commando wires

Pump interruption bridge

Screenshot 2024-01-03 at 14.41.11.png
On the Blue+ heat pump the bridge must be removed and connected to the AUX 1 or 2 location on the rail terminals
bottom of page